When you walk
through our doors….
You walk into a fully enclosed and climate controlled facility allows for complete creative freedom all year round, as well as the security and comfort for your cast and crew.
With support from pre-production to the acquisition of projects, Studio Toronto offers a unique 360 degree white glove experience for creatives at any stage of the process.
Conveniently located 20 minutes away from Toronto’s Pearson international airport and 20 minutes to downtown Toronto
“THE PUBLIC HAS AN APPETITE FOR ANYTHING ABOUT IMAGINATION –
ANYTHING THAT IS AS FAR AWAY FROM REALITY AS IS CREATIVELY POSSIBLE.”
– Steven Spielberg
This Studio complex is one of a kind in Ontario, Offering many unique features
Mill Shops
Costume Department
Makeup
Production Offices
Props & Set Design
OUR STAGES & INFORMATION
STAGE 1
42,700 ft.²
Air conditioning
Grid and track
Electrical power tie in x 3
First aid/safety station
Fire/emergency exit yellow lanes
Loading ramp with exterior access
Bell and red light system
Security cameras
Security door alarm‘s
Standing set interior hospital ICU ward
STAGE 2
50,526 ft.²
289 feet width 209 feet length
Approximate square footage or useable square footage 50,526 ft.²
No air conditioning ductwork
Minimal grid may have some track for trans lights
Minimal emergency fire lanes
First Aid/safety Station
Acoustic insulation in the walls/Sound resistant insulation
Acoustic Insulation interior West stage wall
Military grade 2 feet concrete ceiling And exterior west wall sound resistant
Electrical power sources
3x Electrical tie /cam locks 120/208V AC 3 phase 4 watts max fuse 400 A
One 10 x 10 sound resistant dimmer room.
Washrooms interior and exterior of Stage 2
STAGE 3
32,724 ft.²
Length 202 feet 162 feet width
23 feet from floor to ceiling
No air conditioning / ductwork
No electrical power no tie ins
Limited / some fire lanes / emergency Interior perimeter 4 foot walkway Limited
First Aid /safety station
Interior / Exterior washrooms
Interior paint sink
Sound/ Acoustic insulation in walls
Acoustic Insulation interior East wall
Sound resistant Military grade 2 foot concrete exterior east wall sound resistant
Sound resistant Military grade 2 foot concrete ceiling
STAGE 4/5
24,200 ft.²
Air conditioning
Grid and track
Electrical power tie in
First aid/safety station
Fire/emergency exit yellow lanes
Bell and red light system
Security door alarms
Security cameras
STAGE 7
23,000 ft.²
Air conditioning
Grid and track
Electrical Power tie in x 2
First aid/safety station
Fire/emergency exit yellow lanes
Security door alarms
Security cameras
Men’s and women’s washroom in studio
STAGE 8
18,000 ft.²
Air conditioning
Grid and track
Electrical power tie in
First aid/safety station
Fire/emergency exit yellow lanes
Bell and red light system
Security door alarm
Security cameras
Studio eight standing set
American style Courtroom
With judges chambers
And Courtroom Hall Way
Standing set for US Courtroom
Standing set interior hospital ICU ward
STAGE 9A
17,300 ft.²
Air conditioning
Grid and track
Electrical power tie in
First aid/safety station
Fire/emergency exit yellow lanes
Bell and red light system
Security door alarms
Security camera
STAGE 9B
19,000 ft.²
Air-conditioned
Grid and track
Electrical power tie in
First Aid / safety station
Fire/emergency exit yellow lanes
Bell and red light system
Security door alarms
Security cameras
Three loading docks
COMMON AREA
6,900 ft.²
Parking for 5 ton equipment tucks
Camera truck, Grip truck, Electric truck
Lunch room / background holding
In between stage 7 and Stage 1
Kitchen Projects
Bathroom Portfolios
SETS & PROPS
7,800 ft.²
Features
Small kitchen
Furnished Separate Props office and Sets Office
Work Lighting
One loading dock
Kitchen Projects
MILL SHOPS
8596 ft.²
Small kitchen
Offices for Construction coordinator and Head Carpenter
Washrooms
Loading dock adjacent to Mill shops
Dedicated electrical tie in
WARDROBE
4950 ft.²
Washing machines and drying machines
Small kitchen
Fitting room/change room
Office for Costume designer
PAINT SHOP
6400 ft.²
20 x 20 kitchen shared by Construction
Air conditioning
Washroom
Office for Head Painter
Lockable storage room
Paint sink with paint trap
First aid /Safety station